In manufacturing, from operator on the floor through General Manager
Your maintenance and production teams are fighting. It's costing you every week.
I get them working the same problems, so you cut downtime and recover capacity with the people you already have.
Welcome from Steve
Video coming soon
Plants in my reliability responsibility as Director of Asset Reliability at a Fortune 250 manufacturer
Runtime recovered on one client's main line
To one scorecard, one daily meeting, and gains that hold
“He doesn't show up with a slide deck and a theory. He's stood where your plant manager stands.”
Symptoms
You already know where it bleeds.
Plant managers don't wake up wanting a consultant. They wake up asking why the line went down again, why overtime keeps climbing, and why the fix from last spring didn't hold.
Two departments, two stories
Maintenance blames production. Production blames maintenance. Nobody owns the breakdown.
Missed ship dates
Unplanned downtime eats the schedule, and expedited freight eats the margin.
Supervisors who were never taught to lead
Good operators get promoted, then left to figure it out. Turnover follows.
More output, same crew
The target goes up. The headcount doesn't. Hiring isn't the answer you're looking for.
Fixes that leave when the pusher leaves
Every improvement depends on one strong personality. When that person is out, the plant slides back.
Injuries in the rush
Most recordables happen during a breakdown, a repair, or a rush to catch up. Fewer surprises means fewer injuries.
Less startup downtime on the main line.
About 3.5 hours of runtime back every week.

- Problem
- The main line averaged 7 to 7.5 hours of downtime a week, most of it in the first two hours after startup. Maintenance and production each worked their own side of it.
- Cost
- About $15,000 a week in lost runtime. Roughly $780,000 a year.
- Action
- Got maintenance and production working the startup problem together, with shared work management and a clear line on who owns what.
- Result
- Startup downtime cut 50 to 55%. The plant's worst days now beat what it was doing six to eight months earlier.
“Be prepared to buy in, but also be prepared to invest in the team.”
Scott Massingale, Plant Manager, Brakebush Brothers
The FORGE OS Plant Alignment Program.
Six months. The first 90 days put maintenance and operations on the same plant goals, the same scorecard and the same daily meeting. The next 90 make it hold, with or without me in the room. We measure both.
Fault Lines
Floor walks on both sides. Interviews from the ops manager to the operators. KPI baseline.
Validated cost of the gap
Ownership
Leaders set the plant goals. Each side commits to what it will do and what it needs from the other.
Signed Alignment Charter, one joint scorecard
Rigor
PM release paired with planned, kitted jobs. Operator basic care paired with technician cause reporting.
Habits in place. First results reviewed at day 90.
Gain
Joint root cause on repeat failures and startup losses. Close the biggest losses. Coach supervisors through the hard months.
Measured improvement on your numbers
Elevation
I step back and the plant runs it. Final measurement and a results review with your GM and CFO.
A results report and a plan to sustain it
Each month has a named deliverable, a written target, and a results review with your GM and CFO.
See how the program worksFour questions. Two minutes.
Answer for your plant as it runs today, not as it runs on a good week. Best results come when your ops and maintenance managers each take it.
Training
Frontline leadership for production and maintenance supervisors.
Same room, both sides. Most of it happens on their own floor. Earned, not given.
Give me 30 minutes. Tell me what's happening on your floor.
You'll leave knowing whether the gap is worth a closer look and where I'd start. If it isn't worth closing, I'll tell you.
Not the decision-maker? Most plants find me through their maintenance or reliability manager. Send your plant manager the one-page brief.
Get the 1-page briefBased in Lincoln, Nebraska. I come to your plant.